Can your team ship production GenAI?
A check for engineering leaders: can your team build and ship production GenAI (agents, RAG, MCP), or does the system need a team that has shipped one before? Score your team across five dimensions and get tailored next steps. Pick a depth to begin.
In short
Bigcircle's team readiness assessment asks whether your engineers can build and ship production GenAI, including agents, RAG, and MCP, or whether the system needs a team that has built one before. It scores five dimensions: senior build experience, GenAI skills, delivery capacity, hiring, and production discipline. The result sits on four tiers from Blocked at 0 to 25 to Builder-led at 79 to 100. A quick scan takes about 2 minutes, and the full assessment takes about 5.
How ready the organization is to ship AI is the AI readiness assessment.
What the assessment measures.
- Senior Build Experience 28%
- Engineers who have actually shipped production GenAI (agents, RAG), not just prototyped.
- GenAI Engineering Skills 24%
- Depth across the core toolkit: RAG, agents, tool/MCP integration, and evaluation.
- Delivery Capacity 18%
- Bandwidth to take on AI builds without stalling the rest of the roadmap.
- Hiring & Talent Access 18%
- Ability to find, assess, and close senior GenAI engineers when you need them.
- Production Discipline 12%
- Reliability practices for AI in production: evaluation, observability, guardrails.
Where your team can land.
Blocked
0–25You do not yet have the senior, production-proven GenAI capability in-house to ship what you want to build. The faster route is to have the first system built by a team that has shipped this before, rather than waiting on a long hire or learning on the job.
Stretched
26–50You have some real capability, but it is thin and stretched, with gaps in seniority that slow delivery and add risk. You can make progress, but it is fragile and hard to scale. One option is to take the riskiest system off the team’s plate.
Capable
51–78Your team can build and ship production GenAI. The opportunity now is throughput and ambition: taking on more, harder builds without overloading the people you have. Handing a scoped build or a hard specialist problem to a studio team lets the people you have keep their roadmap.
Builder-led
79–100You have a strong, senior, production-proven GenAI team. You rarely need help, and when you do it is for a hard specialist problem or a system nobody on the team has time for.
Common questions
What does the team readiness assessment measure?
Five dimensions, with the weight beside each name. Senior build experience asks who has shipped production GenAI rather than a prototype, and GenAI skills covers RAG, agents, tool and MCP integration, and evaluation. Delivery capacity is bandwidth that does not stall the rest of the roadmap. Hiring asks whether you can find and assess senior GenAI engineers, and production discipline covers evaluation, observability, and guardrails.
What do the four team tiers mean?
Blocked, 0 to 25, means the team does not yet have senior, production-proven GenAI capability in-house. Stretched, 26 to 50, means some capability is there and gaps in seniority still slow delivery. Capable, 51 to 78, means the team can build and ship production GenAI. Builder-led, 79 to 100, means a strong senior team that rarely needs outside help.
How long does the team readiness assessment take?
A quick scan is about 2 minutes and reads across every dimension. The full assessment is about 5 minutes, with more questions per dimension. The introduction says the result comes with tailored next steps. The Stretched and Capable tiers offer a one-hour review of the results with an engineer who has shipped this.